Friday, January 06, 2006

As an Information Technology professional, I'd prefer to setup a database of "topics" organized by "category" to be discussed by the RAC.

For now, I'll establish a BLOG posting for each category. If you have comments on a specific category, please post a comment to the appropriate category:

(Index to Categories)

Infrastructure Issues


COMMUTING: WMATA to Look at Trash, Ceiling Stability
(I.1 - I.2 Borrowed from BLOG by washingtonoculus)

The Associated Press reports that the Washington Metropolitan Area Transit Authority is taking a look at two problems: vandalism/trashed buses and collapsing ceilings.

I.1 - Trashed-bus problem

On the trashed-bus problem, WMATA says there has been a 20-percent increase in bus trash and graffiti. One of the problems is that WMATA has a hard time retaining cleaning staff (... a 118-percent turnover rate). The agency is re-evaluating its cleaning strategy.

"More Trash and Graffiti on Metrobuses" [AP via WTOP]



I.2 - Ceiling Damage

As you probably remember, part of the Farragut North metrorail station ceiling collapsed earlier this month. Nobody was hurt, but one of the exits to L Street was closed for repairs.

WMATA "will now closely examine" ceiling anchors, instead of having inspectors looking for "obvious signs" of ceiling damage. ... How comforting.

"Metro Promises Better Inspections of Station Ceilings" [AP via WTOP]





All Categories:

0 Comments:

Post a Comment

<< Home